Concrete is mixed by any two methods based on requirement as per quality and quantity of concrete required, Normally for mass concrete where good quality of concrete is required, where mechanical mixture is used.
Carrying out hand mixing of concrete required special skills and care during the process of quality control of fresh concrete. The precaution and the correct way to performing hand mixing of concrete is to undergo the mixing process as recommended by stander procedure.
Mixing by hand is employed only to specific cases where quality control is not of much important and quantity of concrete is less. Stone aggregate is washed with water to remove dust or any other forign material before mixing.
The main purpose is mixing the concrete is to finally obtain a uniformly mixture that shows uniformity in term of color or consistency.
Procedure of Hand mixing of Concrete
1. Measured quantity of sand evenly.
2. Required quantity of cement spread evenly upon the sand
3. The sand and cement is then mixed immedietly, turning the mixing over and over again. untill it is an even color.
4. The sand cement mixture is spread throughout, Then coarse aggregate spread on his top . Then mixing over and over again.
5. A hollow is made in the middle of mixed pile.
6. Three quater of middle of quantity of water is added while the materials turns towards centre of spread , last the remaining quantity of water is added over the fitted with rose head then slowly turning the whole mixture over and over again untill the uniformly color consistency is obtained throughout the pile.
7. 5 percent extra cement is added then the specific the machine mixing, when hand mix cement is produced.
8. The required personal protective equipment shale be worn by the labour and masson while mixing and handling the concrete. The mixing platform should be washed at the end of the day.
Precautions during Hand mixing of Concrete
1. The hand mixing procedure have to be carried out only for small or minimum concrete.
2. The handmixing procedure the employes only for work that will give adequate interval of mixing.
3. The mixing procedure have to be conducted on a water tight platforms.
4. The floor must have one bag of cement at a time in there respective materials.
5. Initially the measured accurate quantity of cement is mixed properly over the water tight platforms.
6. The coarse aggregate have to be placed over this bed of uniform mixture.
7. The addition of water must be done in interval or not in a single streach.
8. The whole mixing must be done unoformly without a hurry.
9. A good and clean showel should be done withmixing procedure.
10. Over mixing of the concrete mixture have to be avoided.